Overview
Assures loads are applied and removed gradually, smoothing voltage variation and preventing damage to any sensitive loads. When activated by a master switch, load control signals are generated in sequential order in half second delays as programmed by the installer. When the master switch is deactivated, loads are sequentially de-energized. Monitors the vehicle for a low voltage condition and automatically sends a signal to sequentially disconnect up to five low priority loads which maintains the voltage to any critical equipment. Manual override input provided. Included: monitor panel alerts the operators when the load shedding has occurred due to low voltage. 12V, 80 ohm signal output activates a standard vehicle lamp and auxiliary relays (lamp not included)
There are no contributions yet.